Installation guide
Top Star installation instructions
How to set a door or window frame with Top Star adjustable distance fasteners — the sequence, the tools and the checks that matter after the frame is fixed.
Before you start
Top Star replaces shims, not judgement. The opening still has to be square enough to accept the frame, and the frame still has to be the right size. What changes is that the final adjustment happens at the fastener instead of under the jamb.
Have the frame, the fasteners, a Torx® driver bit and a spirit level to hand. Check the rough opening for twist before anything goes in — an opening that is out of square by more than the fastener travel can correct is a carpentry problem, not a fastener problem.
Step by step
- Dry-fit and mark. Set the frame in the opening, check the reveal all round and mark the fastener positions on the frame. Keep the marks clear of hinges, locks and any hardware that will be screwed through the same area.
- Start the fasteners. Drive each fastener through the frame into the rough opening until it just grips. Do not torque them down yet; you still need adjustment travel.
- Adjust in two directions. Turn each fastener to move the frame toward or away from the opening. Work around the frame rather than one corner at a time, and re-check the reveal as you go.
- Check level, plumb and diagonal. Measure both diagonals. They should match; if they do not, adjust the fasteners at the long corners before continuing.
- Finish the setting. Once the frame is where it belongs, finish driving each fastener so the head seats properly. Re-check the reveal after the final torque — a frame can move a millimetre when the last fastener seats.
- Hang and re-check. Hang the door or sash, then verify the gap is even. Top Star still has adjustment available at this stage; use it instead of shimming the hinge side.
What you need
- FastenerTop Star adjustable
- DriveTorx® bit
- ToolsDriver, level, tape
- ChecksReveal, diagonals, plumb
- ShimsNot required
The bit matters. The GRK bit holder ships with T-10, T-15 and T-25 bits — see bits, tools and Scru-Guides.
Use the manufacturer's instructions. This page summarises the method our customers use in the field. Always follow the printed instructions supplied with the fastener, the frame manufacturer's installation requirements and the local building code that governs the opening.
Common questions from the field
Can Top Star be adjusted after the frame is finished?
Yes — that is the point. The fastener keeps its adjustment travel after it is seated, which is why it is used on frames that settle or on replacement work where the opening is not perfect.
How many fasteners does a frame need?
It depends on the frame size, the material and the wind load the opening is designed for. Follow the frame manufacturer's fixing schedule; if there is none, ask us and we will tell you what comparable installers use.
Will the white zinc finish match a white frame?
It is a neutral white zinc finish chosen for exactly that reason: it does not read as a dark spot in a white reveal.
Need the fasteners for next week?
Call the toll-free order desk with the frame size and quantity, or send the order form by fax or email.